Welcome to Shenzhen Yanshuoda Technology Co., Ltd.!

Feedback| Favorite |                          

  

Phone:
13632807457

Contact
Phone:13632807457

Shenzhen Yanshuoda Technology Co., Ltd.

Tel:13632807457

Fax:0755-36538558

Mail :szyspower015@szyswps.com

Address:4th floor, building A, no.8 dadi road, shapuweidi industrial zone, songgang town, shenzhen

Q1.What trade terms can you make?
A1: we accept EXW, FOB, CFR..(optional)

Q2.Which mode of transportation can we choose?
A2: express, sea or air.

Q3.What's the moq?
A3: our minimum order is 200pcs, but we accept a small trial order.The more the quantity, the better the price.

Q4.What if the product breaks down?
A4: if there are any defects during the warranty period, we promise to replace them for you.
If there is a defective part, please help us verify the following before replacing the new part:
1).Specification of your LED/equipment.
2).Check the connection solution for the project.
3).Check the working condition of power supply.
If the problem is from our power supply, please follow these steps:
1).Collect and keep all faulty power supplies.
2).Remove the input-output side terminals (if plastic cover products) and take photos.
3).Disconnect the input and output cables on the aluminum power supply and send us the picture.
4).Return the defective parts. If necessary, ask us to test them and we will pay the freight.
However, please note that due to improper use by customers, we will not replace any critical products.

Q5.Can I get the product with my own LOGO?
A5: of course. The minimum order quantity is 300.

Q6.Can I take samples for testing?
A6: yes, but the sample fee should be charged from your account.

Q7.What is the normal delivery time?
A7:5 working days for sample delivery and 15 working days for 2000 products delivery.

Q8.How much do I have to pay for a mass production order?
A8: full payment before production or 30% to 70% deposit (optional)

Q9.How do I pay?
A9: we accept payment by telegraphic transfer, letter of credit, trade guarantee, western union, paypal.More payment options will be added in the near future.

Q10.Can we execute ETL or UL on your product?
A10: yes, the reason is that it takes about two weeks to complete the certification.The relevant documents you should prepare are: company name and logo.The label of the LED driver and the corresponding model of the product you want to use with this list.